Photos depicting the scope of the work that was performed at the former K-Mart site
before the building permits were revoked.
THE  NO HOME DEPOT IN SUNLAND-TUJUNGA CAMPAIGN WEB SITE
Aerial View of Project.
Collapsed Roof can be seen covered in
plywood on top right corner of building.
Note close proximity of residential homes
to site.
Aerial View of Project.
Note close proximity of senior citizen
mobile home park at top left of photo.
View of repair work being
performed after roof collapse.
View of "Deadman" braces
supporting walls to prevent
collapse, as existing 3" interior
floor slab is removed.
Detail of "Deadman" braces and view
indicative of the scope of the work being
performed.
Concrete being pumped into
building for new 6" floor slab with
deep aggregate base.
Existing floor slab being removed from
building.
Steel Beam being raised for installation on loading dock.
Tenant Improvement Permits forbid structural alterations
to exterior of building.
Steel Beam being installed
on exterior loading dock.
A worker dumps toxic debris off the roof
of the job site without a trash chute or
dumpster. Apperson Elementary is less
than 500 feet away.
Steel beams being erected for
garden center. The former K-Mart
had a simple chain link fence.
Another view of garden center
steel beams being installed.
View of structural alterations to
roof, including openings for HVAC
units and skylights.
New HVAC units waiting to be
lifted via helicopter to roof.
View of existing parking lot being
removed.
Return to No2HomeDepot.com